Requirement | Details | NPS Recommendation |
---|---|---|
Minimum Computers | 150 functional computer systems/laptops with 10% backup (15). Specs: 64-bit Dual Core CPU, 4GB RAM, 250-500GB HDD, Win 10/11, 19.5" monitors, wired mouse/keyboard, Chrome/Firefox/Edge. | Ensure all systems are uniform and pre-tested before exam. |
Server | Robust dedicated server supporting 150 systems simultaneously, plus redundant (backup) server in server room. | Use enterprise-grade server with UPS protection and test load before accreditation. |
Networking | Adequate networking between server and workstations. | Deploy gigabit switches and structured cabling. |
Power Supply | All computers connected to 220V with UPS & generator backup. | Install automatic changeover to minimize downtime. |
Hall Capacity | Minimum 150-seat capacity with adequate ventilation and lighting. | Build wide aisles and ensure emergency exits. |
CCTV | Adequate IP CCTV network covering entire premises, minimum 8 cameras, 24/7 functional, 60 days recording, output connected to ATRTL. | Install high-resolution cameras with remote viewing. |
Security | Centre fenced and clearly demarcated. | Use signage and access control gates. |
Buildings | Two buildings-exam hall + reception/waiting area. | Provide clear directional signage for candidates. |
Holding Room | Provide a holding room for candidates outside exam hall. | Equip with chairs and fans for comfort. |
Air Conditioning | Functional ACs in server room and exam hall. | Regularly service to avoid overheating. |
Location | Must be serene, not shared with cinema, mall, or market. | Choose a school-based or private compound environment. |
Power Capacity | 40KVA power supply (200KVA generator, 48 hours backup). | Pre-test generator under full load. |
UPS Backup | Minimum 30 minutes UPS backup. | Install smart UPS for automatic alerts. |
Technical Staff | Minimum 4 technical personnel with networking knowledge. | Conduct mock exams for staff training. |
ICT Staff | Two additional ICT personnel for troubleshooting. | Assign shift schedules for full coverage. |
Generator Engineer | Standby engineer available throughout exams. | Contract with reliable technician ahead. |
Centre Manager | Permanent manager to liaise with NECO officials. | Designate experienced staff member. |